Local Road Closures and Bypass Lane Reductions: Sunday Commute Update

Toowoomba Sunday Traffic Overview
Motorists across Toowoomba should prepare for a busy day of road maintenance and infrastructure upgrades this Sunday, 22 March 2026. Toowoomba Regional Council and the Department of Transport and Main Roads have several active work zones that will necessitate detours and may lead to minor delays on major arteries and suburban collectors.
Suburban Bitumen Resealing Program
A significant bitumen resealing program is currently underway across the central and southern districts. Short-term road closures are scheduled from 6:00 am to 4:00 pm today. Residents are advised to keep road reserves clear of parked vehicles to allow for efficient spray sealing. Key affected areas include:
- East Toowoomba: Closures are in effect on Boyden Street (between Curzon and Wirra Wirra), Cavell Street (between Mary and Mackenzie), and Lamington Street (between Bridge and Cavell).
- South Toowoomba: Expect disruptions on Denis Street, Grey Street (between Water and Ruthven), and Loudon Street. Additionally, work is scheduled for Power Street, Wagner Street, and Winifred Street.
- Harristown: Phyllis Street, between Hampton Street and Anzac Avenue, will also see temporary closures for resurfacing works.
Local detours are clearly signed for these residential zones, but through traffic is encouraged to use major parallel routes such as James Street or Ruthven Street where possible.
Major Arteries and Toowoomba Bypass
On the Toowoomba Bypass, fixed lane closures remain in place between the Warrego Highway West interchange at Charlton and the Gore Highway interchange at Athol. These closures are active from 6:00 am to 6:00 pm today. While traffic flow is maintained, speed reductions are in effect, and heavy vehicle operators should be aware of specific width restrictions currently in place for this corridor.
In South Toowoomba, Perth Street continues to experience disruptions between Ramsay Street and Macarthur Street due to ongoing stormwater pit installations. While the road remains open, motorists should expect intermittent lane closures and traffic control on-site.
Long-Term Infrastructure Projects
Commuters in Centenary Heights are reminded that Ballin Drive remains closed to all through traffic between Mackenzie Street and Stenner Street. This closure is essential for critical water main replacement works and is expected to remain in place through the end of the month. In the northern outskirts, construction on Highfields Road and the Gowrie Lilyvale Road area continues to impact local traffic patterns with temporary detours in effect.
Public Transport and Rail Alerts
Translink has confirmed that the bus stop on Ruthven Street at Jones Street is now permanently relocated to Northpoint Shopping Centre. Passengers using routes 901, 950, or regional school services should utilize the new facility approximately 90 meters north of the former location. No major rail disruptions have been reported for the West Moreton line today, though passengers are encouraged to check real-time digital timetables for any last-minute scheduling changes.

& Juliet at the Empire and Local Sunday Markets

Toowoomba Today: Sunday Style, Royal Anticipation, and a Golden Homecoming

Community Safety and Infrastructure Update: March 22 Public Notices
