Evening Delays Expected on Toowoomba Range and Multiple Local Closures This Friday

Friday Traffic Overview
Commuters in Toowoomba should prepare for a mix of daytime disruptions and a significant change to traffic flow on the Toowoomba Range starting this evening, Friday, February 13, 2026. While the morning peak is expected to flow relatively well on major arteries like the New England Highway, several key local roads are currently undergoing maintenance or infrastructure upgrades that will impact travel times throughout the day.
Major Alert: Toowoomba Range (Warrego Highway)
The most significant disruption for the region begins at 6:00 PM this evening. Authorities have announced changed traffic conditions on the Toowoomba Range (the section of the Warrego Highway connecting Toowoomba to Ipswich). A single-lane restriction will be in place from 6:00 PM Friday through to Tuesday morning. Motorists should note the following:
- Only one lane will be open in affected sections, leading to expected heavy congestion during the Friday evening outbound rush.
- No right turns will be permitted at the Crest carpark.
- Oversize and over-mass (OSOM) vehicles are restricted from using this route during the maintenance window.
- Westbound travelers needing to turn are advised to use the West Gap Creek picnic area for U-turns, while eastbound travelers should look for U-turn points approximately 3km east of the Crest.
Local Road Closures and Work Zones
Within the city and surrounding districts, several projects are reaching milestones today:
- Campbell Street: Between Lindsay Street and Mary Street, the westbound road shoulder and footpath will remain closed until 3:00 PM today. This is to allow for the completion of essential drainage works.
- Ballin Drive: The section between Mackenzie Street and Stenner Street remains closed to through traffic for ongoing water main works. Local resident access is maintained, but detours are in place for all other motorists.
- Cory Street: Commuters may experience minor disruptions between Taylor Street and Russell Street due to continuing bluestone kerb repair works.
- Couper Road: This road remains fully closed for gravel resheeting until late February. Motorists should use alternative routes.
Regional Highway Updates
On the Warrego Highway heading west toward Dalby, construction crews are active as part of the 60km safety improvement project. While the highway remains open, motorists may encounter localized speed reductions and short delays near Oakey, specifically around the Speed Road intersection, where new turning lanes are being installed. Additionally, in the Southern district, Hennessey Road in Cambooya continues to see disruptions due to the Four Communities Pipeline installation project.
Public Transport and Commuter Advice
Translink services are largely operating on their regular Friday schedules; however, bus routes utilizing the Toowoomba Range after 6:00 PM may experience delays due to the lane closures. For those planning weekend travel, be aware that stop closures are scheduled for Norwood Street and West Street starting Saturday morning. Drivers are urged to remain patient, follow all on-site signage, and allow an extra 15 to 20 minutes if traveling toward the Range this evening.

Trivia Night Thrills and Soulful Reflections in Toowoomba Today

Toowoomba Morning Briefing: Sunny Outlooks and Infrastructure Milestones

Asphalt Patching and Intersection Upgrades to Impact Toowoomba Commuters
